Sheetrock On Basement Floor

Then remove the tape.
Sheetrock on basement floor. Rubber tile or rubber sheets 3 8 sq. Mark the location of studs they should be 16 inches apart. Learn how to eliminate common basement leaks and prevent them from reoccurring without wasting money or time. Because a basement is prone to moisture problems consider installing steel floor joists and cross bridging and cover with board sheathing for a total of 4 08 sf.
Tape a one foot by one foot square of plastic sheeting plastic kitchen wrap will do to the concrete wall in your basement with duct tape and leave it in place for 24 hours. The boards are 3 8 inch i was thinking about using a. For sheet rubber in rolls. As well the floor joists are often not perfectly on the same plane with one or more of the floor joists being slightly lower or higher than the others that is why so many people put 1x3 or even 1x4 strapping on the ceiling.
It exists due to the way that a home s foundation is poured. When putting on the wall boards how much if any gap should there be between the concrete floor and the bottom of the board. If you want a tile floor that isn t cold underfoot put down a basement subfloor before you install your tile. The best flooring for a basement is vinyl or laminate which should be installed as a floating floor to allow for changes in the concrete caused by moisture and temperature.
We have a dry basement with a concrete floor. Use your screw gun to secure each board with five 1 inch drywall screws along each stud that the board crosses. For tiles and 1 5 sq. You ve probably seen this resilient flooring in health clubs and gyms.
As we mentioned earlier the basement is naturally humid because of its lower location. After your foundation footings are built your basement walls are poured so that they slot into a keyway. A common question people have when finishing a basement is should i use visqueen or plastic sheeting on one side or the other of the framed basement walls the answer is no. Yes you can but it is not always easy to do.
To start hanging sheetrock pick a starting point and work your way along the wall. This joint where your basement wall and floor meet is known as a cove joint. Hang wallboard so that the 8 foot side runs horizontally and start from the top down. Measure the dimensions and mark them for basement drywall installation.
Plastic will prevent moisture from moving through the wall. This helps to point out the line. How to apply drywall mud read through simple step by step instructions that show how to mix and apply both ready mix and powdered drywall compounds. Some parts of the ceiling in basement might need small pieces of drywall or sheet rock.