Sewage Ejector Basin Installation

Durable steel cover with gasket standard on simplex and duplex sewage basins.
Sewage ejector basin installation. 24 x 24 simplex sewage system 2 or 3 discharge. Duplex covers include two pump plates and an inspection plate. One piece seam free construction on all basins. Sewage ejector pumps move sewage where a gravity system won t work such as in septic systems that are below the main sewer line.
Use a handheld grinder with the appropriate disc to cut the basin. Arrives pre plumbed with no internal plumbing needed and ready for installation. Sewage basins are watertight and gas tight when properly installed. The pro380 series is a large capacity shallow system design featuring a 24 x 24 basin perfect for bedrock and difficult soil conditions.
Find the perfect pump for your basement with the everbilt 1 2hp pre plumbed sewage basin system. Place the sewage basin in the lowest point of the basement to relieve negative basin pressure and allow for proper aerobic activity to occur within the basin. Perfect for pumping below grade toilets washing machines and sinks to a sewer or on site wastewater system. Check with your community on rules and regulations before installing.
Purchase the same basin and cut a measured section from it you must measure from the top of the basin and use the top portion only for your riser extension. How to install a new sewage ejector pump. Ready to install for economical and simple installation. Dimensional engineering data available.
Attach vent pipe to top of basin cover. These vents need to be vented outside and the pipe is often connected to the main stack in the home where your other piping. Https amzn to 2ycxl65 cheaper pump. Purchase items i used in this video.
The pro380 series offers a large 41 gallon capacity and longer pump cycles for extended pump life. The installation of the sewage basin must comply with local codes and standards. The vent comes out of the sump pit and is either connected to an existing vent soil stack or runs up and through the roof. Sewage ejector pump systems are required to have piping attached to the basin in order to vent out odors and buildup of gases.
In this video i show how to plumb and install a sewage ejector pump.